Skip to content
Monday – Friday: 7:30 a.m. – 5 p.m. · Saturday: By appointment · Sunday: ClosedMonday – Friday: 7:30 a.m. – 5 p.m.Since 1984Family ownedGeneral Contractor, Building · NC Lic. no. 000000VerifyLead-Safe Certified Firm (RRP) · US Cert. no. 000000VerifyGeneral liability and workers' compensation insurance
2 more licenses
  • General Contractor, Building · NC Lic. no. 000000Verify
  • Lead-Safe Certified Firm (RRP) · US Cert. no. 000000Verify
  • General liability and workers' compensation insurance
(704) 555-0104

Charlotte, North Carolina

How pricing works

How pricing works

We print no figures, because an addition costs what the house, the lot and the design make it cost. These are the six questions people ask, answered in plain words.

  • What decides the price

    Five things move the cost of nearly every project we build.

    • Size, and whether the room is a bump-out or a second floor

    • The ground, the foundation and what the structure needs

    • How much of the existing house has to change

    • Finishes and systems

    • Permits, engineering and the time the work takes

  • What the estimate includes, and what it doesn't

    The estimate lists the scope, the allowances for things you'll choose, the schedule and what's left out. It doesn't include what we can't see behind a wall until it's open, and it says where we've set aside room for that.

  • What the design fee covers

    The survey of the house, the sketches, the drawings, the engineering and the permit file. It is a separate agreement, signed before the build, and the agreement says whether it's credited if you build with us.

  • How and when you pay

    A deposit when the build agreement is signed, then payments tied to finished work. Each payment comes with a lien waiver for the work it pays for. North Carolina rules on deposits apply, and the contract states them.

  • If the job changes

    A change is written, priced and signed by you before the work moves. It changes the price and the schedule by the amount on the page and by nothing else.

  • When you get the number

    After you've chosen an option and the drawings are done. The price comes in writing, before you sign the build agreement, and it's the figure the contract carries.

Why no figure

Cost guides disagree, and houses do too

Published ranges for an addition differ widely, and none of them knows your lot.

A bump-out on flat ground and a second story over a house with a brick veneer are different jobs. The honest answer comes from the drawing, and we put the number on paper as soon as there is one to price.

Bright empty room with a vaulted ceiling, ceiling fan, beam and French doors

Questions

About the money

Do you charge for the first visit?

No. We walk the house and listen. We charge for the design work that follows, not for the visit.

Do you offer financing?

We don't lend. Some clients use a home equity line, a renovation loan or savings. Talk to your lender before you sign, because the terms are theirs.

Can I choose my own materials?

Yes. Where you choose, an allowance holds a figure in the contract. If your choice costs more, the difference is a change you approve.

What if the estimate is higher than I expected?

We can show you where the cost sits and what changes it. A smaller room, a simpler roof or another option on the comparison page may be the better fit.

Ask us what your house would need

We'll tell you what drives the cost and when you'd have a number.