Monday – Friday: 7:30 a.m. – 5 p.m. · Saturday: By appointment · Sunday: ClosedMonday – Friday: 7:30 a.m. – 5 p.m.Since 1984Family ownedGeneral Contractor, Building · NC Lic. no. 000000VerifyLead-Safe Certified Firm (RRP) · US Cert. no. 000000VerifyGeneral liability and workers' compensation insurance
2 more licenses
  • General Contractor, Building · NC Lic. no. 000000Verify
  • Lead-Safe Certified Firm (RRP) · US Cert. no. 000000Verify
  • General liability and workers' compensation insurance
(704) 555-0104

Charlotte, North Carolina

Whole-house renovation

Whole-house renovation

Kitchen, baths, floors, wiring and walls, planned as one project with one schedule and one person in charge of it.

A whole-house renovation is a plan for the house, not a list of rooms. We look at what the house is, what's behind the walls and what you want to live with, and then build in the order that protects the work already done.

What is included

  • A single plan and schedule for the whole house

  • Wiring, plumbing and ducts replaced where they've reached the end

  • Kitchen, baths and floors

  • Insulation, windows and doors where the plan calls for them

  • Drawings, engineering and permits

White kitchen with a marble-look tile backsplash, an electric range and a range hood

What it doesn't cover

Not part of the price unless we write it in

  • Furniture and storage

    Moved and stored by you, or by a mover we can name.

  • Appliances and fixtures

    You choose and buy them, or we price them as an allowance in writing.

  • Landscaping

    Repair of what the work disturbs is quoted separately.

  • Items found behind the walls

    Written up and priced before the work moves.

What changes the cost

What moves the number

We print no figures here, because the cost depends on the house and the lot. These are the things that move it.

  • The age of the house

    Wiring, plumbing and framing from the 1950s through the 1970s each carry their own surprises.

  • How much the plan changes

    Moving walls, plumbing and the kitchen costs more than keeping them where they are.

  • Finishes

    Floors, cabinets, counters and tile. The widest range of any line in the plan.

  • Systems

    A new electrical panel, new plumbing lines, new ducts or a new heat pump.

  • Living in the house

    A phased job keeps you home and takes longer. A cleared house goes faster.

  • What's behind the walls

    Rot, old wiring and old pipes. We open what we can before pricing.

How it goes

From the first visit to the last walkthrough

  1. 01

    Step 1: Walk the house

    We open the attic and crawlspace, check the panel and the pipes, and list what you want.

  2. 02

    Step 2: Draw the plan

    A single set of drawings for the whole house, with the order of work.

  3. 03

    Step 3: Permit

    One file for the whole project, filed by us.

  4. 04

    Step 4: Demolition and what's behind the walls

    We open walls, find what's there and tell you before we price the change.

  5. 05

    Step 5: Rough-in and inspections

    Framing, wiring, plumbing and ducts, then the inspections.

  6. 06

    Step 6: Close up and finish

    Insulation, drywall, cabinets, floors, tile and paint.

  7. 07

    Step 7: Walk through

    A walkthrough with a written list, then a follow-up visit.

Permits

Permits and rules

Mecklenburg County Code Enforcement issues the building permits for electrical, plumbing, mechanical and building work, and each trade has its own inspections. We schedule them.

If your house is in a local historic district, exterior changes need a certificate of appropriateness from the Historic District Commission, and interior work generally does not.

Houses built before 1978 may have lead paint. The EPA's renovation rule covers paid work that disturbs paint, and always covers window replacement and demolition. Our certification is on the credentials page.

Questions

Common questions

Can I live in the house during a whole-house renovation?

You can, if we phase it. It takes longer, and some stretches, like the kitchen and a bath at once, are hard on a family. We plan the phases with you.

What if you find something behind the wall?

We stop, show you, write up the fix and the price, and move on when you've signed. Nothing is changed on a handshake.

Do you do the design?

We draw the plans and the construction details. If you want an interior designer for finishes, we work with yours.

How long will it take?

The schedule is part of the plan, and it depends on the permit and on what we find. We give it to you in writing before you sign.

Start with a walk around the house

We'll look, measure and tell you what we see.